Scott River Wind Farm — Approved. Not Yet Proven.
Scott River · Warren–Blackwood · Western Australia
APPROVED NOT YET PROVEN RDAP · EPA · EPBC APR 2026 EPA · WASYNERGY DCCEEW DWER RDAP COMMUNITY

Scott River
Wind Farm.
Approved.
Not yet proven.

Up to 20 turbines. Up to 250 metres tall. Three approvals granted in 2026 — the WA EPA decided not to assess it, the federal government approved it with conditions, and on 30 April the RDAP unanimously approved it. The question now is whether the conditions protecting this landscape will be enforced before construction begins.

Australia needs renewables. It needs them urgently. That is exactly why this process has to be done properly — and why the conditions must be publicly verifiable before ground is broken.

“Many in the community feel that the engagement occurred after key decisions were already well advanced — rather than at the formative stage, when concerns could genuinely shape outcomes.”

Bevan Eatts MLA · WA Legislative Assembly · 19 February 2026

SCROLL
POSITION

Australia needs renewables. It needs them urgently. That is exactly why this process has to be done properly.

All three regulatory approvals have now been granted. The WA EPA decided not to formally assess the project in December 2025. The federal government issued its EPBC approval with binding conditions in February 2026. And on 30 April 2026, the Regional Development Assessment Panel unanimously approved the development application — subject to environmental and planning conditions — at a meeting in Margaret River that drew a large crowd of supporters and opponents.

Synergy says it is now analysing the decision and requirements to determine the project's commercial viability. A final investment decision has not been made.

The question is no longer whether this can be approved. It is whether the conditions that came with those approvals are strong enough, and public enough, to protect what they were designed to protect. Getting that right matters — for this project, and for every renewable project that follows.

The Project — What is being proposed
Proposed turbines
0 turbines
Up to 20 turbines · up to 100 MW · expanded from 3 after Synergy acquisition
Turbine height
0 m
Up to 250 metres to blade tip · blade minimum 59m above ground when operating
Eiffel Tower
330m
Scott River
250m
Big Ben
96m
Three approvals granted
All
approved
EPA not to assess · EPBC conditions · RDAP unanimous
WA EPA: Dec 2025 · Federal EPBC: 27 Feb 2026 · RDAP: 30 Apr 2026 · 405 objections · 155 in support · Synergy analysing commercial viability
01 — THE THREE APPROVALS
What was decided
All approvals granted · conditions now the story

In the space of five months — December 2025 to April 2026 — all three regulatory decisions were handed down. Each came with conditions. The accountability test starts now.

The regulatory timeline — tap any event to unfold
Pre-2024
Community wind concept — then Synergy acquisition and expansion
+ UNFOLD
The project originated as a community wind farm concept under the Augusta–Margaret River Clean Community Energy (AMRCCE) initiative. State-owned utility Synergy acquired the project and expanded the proposal from 3 turbines to up to 20 turbines generating up to 100 MW. Located approximately 15 km north-east of Augusta, on the Scott River Plain.
Source: EPA referral records · EPBC 2025/10370
June 2024
WA EPA flags national wind farm standards as insufficient — while assessing Scott River
+ UNFOLD
The WA EPA submitted a formal response to the federal draft Onshore Wind Farm Guidance. Signed by Deputy Chair Lee McIntosh, it identified six specific deficiencies: optional avoidance language, absent buffer zones, bird and bat plans allowed post-approval, insufficient monitoring data, cumulative impact gaps, and community aspirations absent from the process. Submitted while the EPA was simultaneously assessing Scott River.
Source: WA EPA submission to DCCEEW, 12 June 2024 EPA Submissions
October 2024
50+ residents attend Augusta forum · confidentiality agreements reported
+ UNFOLD
More than 50 residents attended a community forum in Augusta. Attendees described feeling that the project's location, scale and design were settled before they entered the room. Some landowners reported being approached with confidentiality agreements before the project was publicly discussed. A 623-signature petition was later filed referencing specific EPBC Act provisions.
Source: AMR Times reporting AMR Times
19 February 2026
Scott River raised in WA Legislative Assembly
+ UNFOLD
Bevan Eatts MLA (Warren–Blackwood) raised the Scott River wind farm in his response to the Premier's Statement: "Many in the community feel that the engagement occurred after key decisions were already well advanced, rather than at the formative stage, when concerns could genuinely shape outcomes."
Source: WA Legislative Assembly Hansard, 19 February 2026 WA Hansard
27 February 2026
Federal EPBC approval — not a controlled action if taken in a particular manner
+ UNFOLD
DCCEEW Branch Head Kylie Calhoun issued the referral decision under sections 75 and 77A of the EPBC Act. Finding: not a controlled action, provided it is taken in the manner set out in Annexure A. Annexure A contains 16 legally binding conditions covering clearing limits, turbine siting, Black Cockatoo blade height (59m minimum operating height), dewatering triggers, and acid sulphate soil management. Breaching any condition makes the action a controlled action requiring full Ministerial approval.
Source: DCCEEW referral decision, EPBC 2025/10370, 27 Feb 2026 EPBC Portal
December 2025
WA EPA decides not to formally assess the proposal
+ UNFOLD
Under s.38G(1) of the Environmental Protection Act 1986, the EPA decided not to assess the proposal. The EPA found that likely environmental effects are not so significant or unmitigated as to warrant formal assessment. The decision was made on the basis of Synergy implementing the proposal in accordance with the Proposal Content Document, Referral Information, and the amended Preliminary Bird and Bat Adaptive Management Plan (Preliminary BBAMP). 384 public submissions were received. The proponent commissioned a peer review of the Preliminary BBAMP and provided an amended version addressing the EPA's concerns.
Source: EPA Chair Determination, Wind Farm in Scott River, App-0031437 · December 2025
30 April 2026
RDAP unanimously approves development application — subject to conditions
+ UNFOLD
Western Australia's Regional Development Assessment Panel unanimously approved the $500 million development application at a meeting in Margaret River that drew a large crowd of supporters and opponents. The approval is subject to environmental and planning conditions. 405 objections and 155 letters of support were submitted during public consultation. RDAP deputy presiding member Clayton Higham acknowledged community concerns but noted: "It's not a numbers game when it comes to planning — it's about the planning arguments presented." Save the Scott River coordinator Scott Baxter said the panel had failed to address concerns over the project's size, noise and environmental impact. Synergy says it is now analysing the decision and requirements to determine commercial viability. A final investment decision has not been made.
Source: ABC News, 30 April 2026 ABC News · Construction Review Online CRO
RDAP vote — development application · 30 April 2026 · Margaret River
405
OBJECTIONS lodged
vs
155
LETTERS IN SUPPORT
Objections (405)
In support (155)
RDAP decision: Unanimous approval subject to environmental and planning conditions. RDAP deputy presiding member Clayton Higham: "It's not a numbers game when it comes to planning." · Source: ABC News, 30 April 2026
02 — THE GROUND HAS A MEMORY
Acid sulphate soils
Federal condition: Annexure A §§4–5 · DWER oversight

The Scott River Plain has acid sulphate soils at shallow depth. Every regulatory approval recognised this. The federal Annexure A conditions address it directly. The question is whether those conditions will be enforced in real time.

Acid sulphate soils contain iron sulphides that are stable when waterlogged and undisturbed. When excavated or drained — as turbine foundations, access roads, and cable trenches require — they oxidise and produce sulphuric acid. That acid kills aquatic life, releases heavy metals, and can sterilise waterways for years. The Scott River, Blackwood River, and Flinders Bay estuary are downstream.

The WA EPA's Chair Determination also identified this: "potential impacts on terrestrial environmental quality from disturbance of acid sulfate soils" and "inland waters from dewatering and disturbance of acid sulfate soils" were listed as key environmental factors in the referral information.

Dewatering trigger ladder — Annexure A §4 · four-stage system
BASE
Pre-construction baseline — Synergy must record natural groundwater seasonal variation before any works begin
The "latest version of the preliminary Acid Sulphate Soils & Dewatering Management Plan" defines how the baseline is recorded. All triggers are measured against it. This plan must be produced before construction starts — it is not yet publicly available.
BASELINE
T1
Drawdown exceeds natural seasonal variation by more than 0.1 metres — beyond 100 metres from any dewatering location
§4(a): If groundwater drops more than 0.1m outside natural seasonal range at a point 100m+ from the dewatering area, the first trigger is breached.
TRIGGER 1
T2
If T1 exceeded within 50m of wetland habitat → surface water monitoring must commence immediately
§4(b): Full field analysis — pH, salinity, water level, acidity, alkalinity, turbidity, metals, nutrients. Frequency set in the ASSDS Management Plan.
TRIGGER 2 — MONITOR
T3
Monitoring shows any decline in water levels or quality at a wetland habitat → dewatering within 200 metres must cease
§4(c): Not slow down — cease. Operations within 200m of the impacted wetland habitat must stop until the issue is resolved.
STOP WORK
03 — WHAT THE EPA ACTUALLY SAID
WA EPA Chair Determination · Dec 2025
Not to assess · s.38G(1) EP Act 1986

The WA EPA's decision not to formally assess is not a clean bill of health. It is a finding that the impacts are regulable through other processes — provided those processes work.

The EPA's Chair Determination identified four preliminary key environmental factors: terrestrial environmental quality, terrestrial fauna, inland waters, and social surroundings. It found the impacts can be regulated by other decision-making processes — including the EPBC Annexure A conditions, a clearing permit under Part V of the EP Act, and the Preliminary Bird and Bat Adaptive Management Plan (Preliminary BBAMP), which was peer-reviewed and amended before the decision.

In a separate submission in June 2024, while assessing the project, the EPA told the federal government that the national wind farm assessment standards are not adequate — six deficiencies, signed by Deputy Chair Lee McIntosh. Those six findings remain on the public record.

WA EPA Submission — 6 findings · tap to step through
04 — BIRDS, BATS AND BLACK COCKATOOS
EPBC-listed species · Annexure A §3

Three species of Black Cockatoo are present at Scott River. All three are EPBC-listed. The federal Annexure A conditions set a minimum blade height of 59 metres above ground level when turbines are operating.

The EPA's decision not to assess was made on the basis of Synergy implementing the amended Preliminary Bird and Bat Adaptive Management Plan. That plan — peer-reviewed at the EPA's request — defines trigger and threshold actions for ongoing risks to terrestrial fauna, including collision risk. The EPBC Annexure A blade height condition (C11) adds an additional federal layer.

EPBC-listed species at the Scott River site — conditions that apply
🦜
Carnaby's Black Cockatoo (Zanda latirostris)
Endangered — EPBC
Critical foraging wetlands and nesting hollows at site · Annexure A: no potential nesting trees to be cleared · 10m buffer · 59m minimum blade height when operating
🦜
Baudin's Black Cockatoo (Zanda baudinii)
Endangered — EPBC
Covered under "Black Cockatoos" definition in Annexure A · 59m minimum blade height condition applies
🦜
Forest Red-tailed Black Cockatoo (Calyptorhynchus banksii naso)
Vulnerable — EPBC
Species records mapped in Attachment C of federal decision · 59m minimum blade height applies
🐾
Western Ringtail Possum (Pseudocheirus occidentalis)
Critically Endangered — EPBC
Habitat quality mapped in Attachment B · max 0.50ha Moderate-to-Low clearing · max 0.03ha Moderate quality clearing
🌿
Scott River Ironstone Association
Critically Endangered TEC — EPBC
Exists nowhere else on Earth · zero clearing of the TEC permitted · max 0.01ha contiguous native vegetation within 50m buffer · dewatering effluent must not enter it directly or indirectly
Annexure A condition C11 — blade height: No part of any wind turbine blade attached to an operating turbine may be less than 59 metres above ground level. Measured from natural ground level at each turbine location prior to construction. Applies to all operating turbines. Protection for Black Cockatoos and migratory species. Requires operational shutdown protocols during high-risk periods.
05 — THE COMMUNITY
405 objections · 155 in support

The RDAP meeting on 30 April 2026 drew a large crowd of both supporters and opponents. 405 objections and 155 letters of support were lodged during public consultation. The RDAP approved it — but the community is not done.

Save the Scott River coordinator Scott Baxter said the panel had failed to address concerns over the project's size, noise and environmental impact. He described being "in shock" after the decision. Synergy has said it is still determining commercial viability — no final investment decision has been made.

"Many in the community feel that the engagement occurred after key decisions were already well advanced, rather than at the formative stage, when concerns could genuinely shape outcomes."
Bevan Eatts MLA (Warren–Blackwood) · WA Legislative Assembly · 19 February 2026 WA Hansard
Community and approvals — documented evidence
Objections lodged
0
During RDAP public consultation
The largest organised opposition was Save the Scott River
Support letters lodged
0
During RDAP public consultation
Supporters cited renewable energy need and local employment
EPA public submissions
0
Received during EPA referral process
EPA referral App-0031437 · Dec 2025 decision
Community forum
0+
Residents at Augusta forum · October 2024
Described feeling location and design were settled before they arrived AMR Times
FIVE THINGS
Before construction begins

Three approvals have been granted. A final investment decision has not been made. Before construction begins, there are five things the public should be able to see. Not because the approvals were wrong — but because accountability requires it.

Five things the public should be able to verify before construction begins
01
The preliminary Acid Sulphate Soils & Dewatering Management Plan
Annexure A §4 requires all dewatering triggers to be measured against a pre-construction baseline recorded in this plan. It must exist before construction begins. Every dewatering trigger in conditions C12–C14 is unenforceable without it. It should be public before ground is broken.
NOT YET PUBLIC
02
Pre-clearing survey results across the full development envelope
Annexure A states the final disturbance footprint will conform to pre-clearing surveys and detailed design. Those surveys determine exactly where every threatened flora individual, nesting tree, and TEC boundary sits. The public should be able to verify these before any clearing commences.
NOT YET PUBLIC
03
The full amended Preliminary Bird and Bat Adaptive Management Plan
The EPA's decision not to assess was made on the basis of Synergy implementing the amended Preliminary BBAMP. That plan was peer-reviewed and amended at the EPA's request. It defines trigger and threshold actions for collision risk. As the foundational document for the EPA's decision, it should be fully public.
NOT YET FULLY PUBLIC
04
The full RDAP conditions of approval
The RDAP approved the project "subject to environmental and planning conditions." Those conditions have not been fully published. They define what Synergy must do before, during and after construction. The public has a right to see them.
CONDITIONS NOT YET PUBLISHED
05
A public monitoring and compliance framework
The Annexure A conditions, BBAMP trigger actions, and RDAP conditions are only as strong as their monitoring and enforcement. Who checks the dewatering trigger readings? Who verifies the blade height condition? Who publishes results? The community needs a defined, public channel to track compliance — not hear about breaches after damage has occurred.
NOT YET DEFINED
THE QUESTION

This is not an argument against renewable energy. Wind is part of the answer. All three regulatory processes have now run their course and delivered approvals. Synergy is still determining whether the project is commercially viable.

The question that remains — the one the community at Scott River has been asking — is whether the conditions that came with those approvals are real safeguards or paperwork. Whether they will be monitored, enforced, and publicly verifiable. Whether the acid sulphate soils will be managed. Whether the Black Cockatoos will be protected. Whether the Scott River Ironstone Association — which exists nowhere else on Earth — will remain intact.

THE QUESTION
Can Synergy, DCCEEW, and the relevant state agencies demonstrate that this project — now approved at every level — is being managed to the standard the conditions require? Not whether it will generate clean energy. We know it will. Whether the conditions are real.

If the answer is yes: show the work. Publish the ASSDS Management Plan. Publish the full RDAP conditions. Make the BBAMP public. Define the monitoring framework. Release the pre-clearing survey results.

If the conditions are being met, transparency costs nothing. If they are not being met, the public has a right to know before construction begins. The people of Scott River asked for a proper process. They deserve to know whether they got one.

APPROVED. NOT YET PROVEN.
Approval is not proof of safety. Proof is what comes next. The people of Scott River asked for process. The law gave them conditions. What happens between now and the first turbine foundation is the test of whether those conditions mean anything at all.
The people of Scott River asked. The conditions are on record. The proof should be too.
RDAP approval: 30 April 2026 · 405 objections · 155 in support · subject to conditions
EPBC 2025/10370 · Not a controlled action if taken in the manner set out in Annexure A · 27 Feb 2026
WA EPA App-0031437 · Not to assess · s.38G(1) EP Act 1986 · December 2025
WA Legislative Assembly Hansard, 19 February 2026 · Bevan Eatts MLA, Warren–Blackwood
WA EPA submission to DCCEEW, 12 June 2024 · Deputy Chair Lee McIntosh